INIANLAN NextGen
Master Plan

Current-source volume · 26 August 2026

Decision maps,
not completion maps.

This is an additive, read-only map volume for the interfaces currently holding work. It records what a map actually supports today: observed conditions, held ownership and safety gates, plus one narrowly bounded civil-only SYS03 reference. It does not certify a district, route, venue, bunker, or railway as complete.

12exact evidence maps
10held-interface maps
2civil-only SYS03 references
0new construction claims

Reading rule

A condition map is not an authorization.

Map colors, reservation outlines, route traces, and local geometry are evidence for a next decision. They do not confer ownership, resolve fluids or gravity, open a doorway, create public egress, or approve a physical release. The original historical atlases remain available separately and have not been overwritten.

MP01HELD CONTROL INTERFACE
Cheyenne control-staging source state

Cheyenne control-staging source state

Observed OFF indicator topology. It is not a commissioned control and it authorizes no door, utility, or route connection.

MP01HELD CONTROL INTERFACE
Cheyenne access-authority topology

Cheyenne access-authority topology

Current boundary and authorization topology. Runtime interaction proof is still required before a control release.

MP02 / MP04HELD OWNERSHIP INTERFACE
SubTropolis / connector functional-successor gate

SubTropolis / connector functional-successor gate

The raw continuation is not an owned room, egress route, or transfer. MP04 owns no current-world cells.

MP02HELD OWNERSHIP INTERFACE
B08 handoff and remaining void

B08 handoff and remaining void

The 719-cell restricted service spine is retained; the remaining void is not a finished chamber, public entry, or egress route.

MP05HELD INTEGRATED RELEASE
B07 first-release prerequisite gate

B07 first-release prerequisite gate

Ownership, containment, gravity, receiver, and route conditions must resolve as one exact package; no independent B07 subphase is released.

MP05HELD FLUID / GRAVITY INTERFACE
B07 containment and gravity constraints

B07 containment and gravity constraints

A source-state constraint map, not a construction drawing or an approved fluid receiver.

MP05HELD SURFACE RECEIVER
B07 surface receiver decision plane

B07 surface receiver decision plane

Local geometry is observed, but no exterior face is a classified receiver, doorway, or egress endpoint.

MP08HELD CONTAINMENT / ENDPOINTS
C1 containment and interface screen

C1 containment and interface screen

The dry three-wide observation is not an accepted route: roof, floor, cavern thresholds, ownership, drainage, and returns remain unresolved.

MP13HELD EGRESS / ACCESS INTERFACE
Westlight lower public / staff topology

Westlight lower public / staff topology

The observed public-to-staff connections fail safe partitioning. This is not an access-control completion.

MP13HELD EGRESS / ACCESS INTERFACE
West service tower / high-deck section

West service tower / high-deck section

The vertical shell is staff-only and does not satisfy public egress or accessibility requirements.

SYS03AS-BUILT CIVIL-ONLY REFERENCE
High-16 descending bypass plan

High-16 descending bypass plan

This is a sealed civil void and gravity-safe shell only—not track, a station, public access, or passenger service.

SYS03AS-BUILT CIVIL-ONLY REFERENCE
High-16 staged-gravity / ownership profile

High-16 staged-gravity / ownership profile

The retained upper-grid water system and transport interfaces remain held; the profile does not commission a route.

Source and scope

Exact copies, explicit limits.

The held-interface maps bind to the current SYS03 post-state evidence where applicable: region SHA-256 3e0d739e5ceda6fb9a828e9b5947e15d00864f7f15f54d1c099e011477e3bcfd. The two SYS03 maps are published from its sealed civil-release record and remain non-transport references.

See the machine-readable publication manifest for exact source paths, per-map hashes, and the immutable history policy.