# Master Plan Railway — single cross-town execution plan

> **Builder entry point:** use the companion [Master Plan Builder Execution
> Runbook](MASTER-PLAN-EXECUTION-RUNBOOK.md) for delegation, package order,
> acceptance evidence, and stop conditions. This document remains the
> reconciliation record; it does not authorize unguarded world edits.

Status: **READ-ONLY RECONCILIATION COMPLETE — NO CONTINUOUS CROSS-TOWN PASSENGER RAILWAY YET PROVEN**

Evidence cutoff: 2026-08-22 UTC

Machine input: [master-plan-railway-report-input.json](master-plan-railway-report-input.json)

## 1. Decision

Treat Masterplans 01–13 as one town system, but do not flatten their evidence
or authority into one overwrite boundary. Accepted physical evidence controls
built status; catalog records describe durable accepted objects; old design
documents control intent only where a later current-world plan has not
superseded them.

The cross-town railway is a proposed delivery program, not an as-built claim.
The current evidence proves bounded roads and pedestrian components, one
552-cell passive B09 rail, one bounded maintenance shuttle over indices
`9..25`, and sealed Empty Eight future stubs. It does not prove a continuous
cross-town passenger railway, public station network, or whole-corridor
operation.

The controlling subway work sequence is the
[Passenger Railway Programme](PASSENGER-RAILWAY-PROGRAM-2026-08-22.md), with
the [existing-rail inventory](PASSENGER-RAILWAY-INVENTORY-2026-08-22.md),
[network/stop register](2026-08-22-passenger-railway-network-design.md), and
[engineering standard](PASSENGER-RAILWAY-ENGINEERING-STANDARD-2026-08-22.md)
as its supporting records. It converts the actual B09 guideway only through
bounded packages; the restricted shuttle is not public service. Every new or
converted passenger segment has a continuous behind-wall **6×6 service
corridor** with controlled exits, built and QA-passed before powered passenger
trials.

## Circulation correction — required before the next public-realm build

Catalog completion and a one-cell normal-walk line do not prove a usable route.
The current circulation audits identify three failed bidirectional links
(C01 portal→L1, MainStreet portal→warehouse, and Observatory gallery→hub),
two legacy one-tread cores (MainStreet H11 and the Ravensreach Library), and
several districts whose route width/landing geometry is not current-proof.
Every later route package starts with `CIRC-QA-CORE-01`: a fresh-source
walkable-cell graph plus width, headroom, rise/run, landing, door, lighting,
fluid, and ownership evidence. The companion
[Builder Execution Runbook](MASTER-PLAN-EXECUTION-RUNBOOK.md) defines the
required circulation classes and the ordered correction packages.

The first Ravensreach circulation repair is accepted: the Moot upper spine now
has a 7-wide × 6-high envelope, 1:2 flights, seven-deep landings, and a
bidirectional normal-walk QA proof. Clerks Hall remains reachable but empty,
and Attic Store still has no proven standable floor; those rooms remain a
separate architectural package, not a furnishing pass. Conversely, the current
Westlight census proves material fabric only; `CIRC-WL-ARRIVAL-01` and
`CIRC-WL-ARRIVAL-ROAD-01` must survey route/egress geometry before any repair
release is proposed.

This plan authorizes no Minecraft, RCON, fleet, service, database, media, or
publication mutation.

## 2. Current evidence identity

- Latest accepted Combined Zones physical post:
  `data/worldsnap-r08am-post-20260822T161818Z`
- Complete-save SHA-256:
  `0bcbba4fad530b8a5c22bbef295978cc4864270de652acba18372e445b584699`
- Region SHA-256:
  `30f5c3394c4080d74156a59deb613290366c130e72a859261625117b8276541f`
- Current read-only world catalog SHA-256:
  `bf2b31c121c7d270942f6fa73181f8c71409cfc24c01952d99d8cd35583c8c02`
- Rebound R13 bounded-MVP acceptance:
  [PASS_R13_CONSOLIDATED_MVP_ACCEPTED](../../data/world-review/combined-zones-r13-consolidated-mvp-acceptance-r08al-r08am-doc-rebind-20260822T164000Z/r13-final-acceptance.json)

Accepted snapshots remain provenance after a later physical commit. Every new
physical package still needs a fresh same-invocation immutable source.

## 3. Whole-town status at a glance

| Plan | Area | Current delivery class | Controlling conclusion |
|---|---|---|---|
| 01 | Cheyenne Mountain Complex | **Partial** | Bounded Cheyenne gallery/contact-route components exist under MP05; the original standalone 15-building program is not accepted as a completed whole. |
| 02 | SubTropolis | **Partial** | Deep/service-route context exists; the full pillar-grid, tenant, lobby, climate, and public connection program is not commissioned. |
| 03 | Houston Tunnel System | **Partial** | A bounded B07 headhouse and internal circulation exist; the full 24-block CBD/tunnel network and public through-route do not. |
| 04 | Combined Complex | **Partial / superseded placement** | Normalized architecture remains design lineage; MP05 controls current-world coordinates and physical truth. |
| 05 | Combined Zones | **Bounded MVP built; original broader program partial** | R07–R13 bounded MVP and the R08AL/R08AM Empty Eight round are accepted; major retained interfaces remain closed. |
| 06 | Western Approach Road | **Cataloged built; current condition unverified** | Two complete records and the six-point road alignment exist; current route, drainage, clearance, and accessibility need re-survey. |
| 07 | MainStreet America | **Accepted built; current condition unverified** | 630 complete records and one removed fence record; no fresh condition claim. |
| 08 | Raven Rock | **Catalog/historical only** | 81 complete catalog records and historical dry T2b evidence exist, but no current accepted complex release; wet thresholds, route truth, accessibility, and network legibility remain open. |
| 09 | Ravensgate | **Cataloged built; adjacent proposals unbuilt** | Frozen district and 13 records complete; pavilion/water/tunnel/access schedules are not physical acceptance. |
| 10 | Ravensreach | **Built; operational configuration partial** | Physical town and MainStreet route accepted; citizen-fleet configuration remains proposed and unapplied. |
| 11 | Town Expansion R1 | **Accepted built** | Terminal release, routes, media, catalog, exact interfaces, and rollback accepted. |
| 12 | Westlight District | **Cataloged built; current condition unverified** | 59 complete interior records; later Town Expansion chronology and exact overlaps require reconciliation. |
| 13 | Westlight Venue | **Accepted/cataloged built; current operations unverified** | Venue and 524-cell focal display accepted; current event, emergency, accessibility, and mode operation are not proven. |

No plan is allowed to treat a neighboring plan's bounding box as shared-cell
authority.

## 4. Area plans

### MP01 — Cheyenne Mountain Complex

Built/accepted:

- R10A supplies 594 accepted liner cells, a connected 660-cell secure-gallery
  route, and a retained 20-cell fail-closed cap.
- R10G/H provide the bounded institutional contact sequence and passive route
  lighting.
- R12A/M/O commission only bounded passive internal circulation to explicit
  holds.

Not built or not proven:

- The complete standalone 15-building program, Battle Cab visitor sequence,
  active controls, public access, exterior use, and whole-complex operation.

Remaining design: preserve current B03/Z10 state; first survey the obstructed
or unsupported `0..187` route indices and every secure/exterior interface.
MP01 coordinates are not current-world setout.

### MP02 — SubTropolis

Built/accepted:

- The combined R03/R04 deep release changed 7,345 cells with an exact inverse.
- R07C accepted 5,252 service-tunnel cover cells and 28 route openings after
  the first attempt compensated safely.

Not built or not proven:

- The full 200×200 pillar/tenant program, public lobby, vault/climate
  operation, complete visitor sequence, C3, or an open public rail/shaft link.

Remaining design: freeze the exact current occupancy/route envelope, then
separate tenant, lobby, climate, utility, C3, and vehicle packages.

### MP03 — Houston Tunnel System

Built/accepted:

- R07J provides a grounded deck and fail-closed 7×7 B07 headhouse.
- R09A-D provides lower lobby/stair circulation only to its upper hold.
- R09J/K accepts a 91-surface passive internal inspection component.

Not built or not proven:

- The full 24-block surface CBD, tower and food-court program, indices
  `0..20`, lower wet interface, exterior door, lift, smoke, power, drainage,
  accessibility, and a public through-route.

Remaining design: resolve the exact wet and unsupported-gravity interfaces
before designing any through-route. Surface towers and B07 circulation retain
separate ownership.

### MP04 — Combined Complex

Built/accepted: MP04's normalized program informed MP05 R00–R13.

Not built or not proven: the original separate-world 1,500×1,500×800 layout,
old ravine/skybridge variants, and its independent coordinate system are not
current-world authority.

Remaining design: use MP04 only for normalized child-program intent. MP05 or a
later exact successor controls all physical coordinates and interfaces.

### MP05 — Combined Zones

Built/accepted:

- Six of six R07–R12 bounded dependencies plus G16–G19.
- R08AL's eleven clean, lit, publicly viewable vacant south retail bays and
  restricted 12-room BOH.
- R08AM's secured grand stair, 100-seat theatre, and consensual adults-only,
  non-explicit restricted private-club annex.
- Enumerated R11 max-step-one highway/pedestrian surface components.
- R12Q's 552-cell passive B09 rail and R12R's bounded maintenance shuttle.

Not built or not proven:

- A whole C1 corridor, passenger rail, interchange, hydraulic capacity,
  drainage, utilities, or public transport.
- Empty Eight S06/north public opening, N06, wet/gravity smoke residual,
  riser, FIRE-EG-B, future stubs, and external systems.
- P1-B12, C2, and C3.

Remaining design: advance substantial disjoint packages from fresh sources;
never enlarge a bounded surface, passive rail, or maintenance shuttle into a
whole-system claim.

### MP06 — Western Approach Road

Built/cataloged: a seven-block-wide Ravensgate-to-Westlight road through six
authored points; two of two catalog records complete.

Not proven: current bidirectional travel, vertical clearance, shoulders,
drainage, lighting, bridge stairs, and accessibility.

Remaining design: read-only reconcile Ravensgate, Westlight, and Town
Expansion shared cells, then package only evidenced defects.

### MP07 — MainStreet America

Built/accepted: 631 durable records—630 complete and the retired F01 fence
removed—plus 96/96 material closure checks and accepted internal connectivity.

Not proven: current damage/obstruction state or any new PassageWay, Raven
Rock, regional-road, or Town Expansion interface.

Remaining design: refresh condition and external-route seams before exact
maintenance. Preserve containers, interiors, mountain routes, and the protected
property envelope.

### MP08 — Raven Rock / Site R

Catalog/historical evidence only: 81/81 durable features, five structures, 28
rooms, RR-Z5, and historical dry T2b evidence at `x=-145..-136`. This is not a
current accepted Raven Rock bunker-complex release: S1 was rolled back and the
historical T2B scope was superseded.

Not built or not proven: any current Raven Rock complex release, the T2b wet
edge, C2 wet Cavern C threshold, RR-N6 water interface, complete bidirectional
comfort/accessibility, and uniform network signage.

Remaining design: route-truth survey first, wet/gravity containment second,
vertical-circulation/life-safety work third, legibility rollout last.

### MP09 — Ravensgate

Built/cataloged: the frozen `X=-148..-64`, `Z=-562..-420` district, four
buildings, seven rooms, and 13/13 complete records.

Not built or not proven: adjacent pavilion, pool, monument, surface-water,
tunnel, or access schedule proposals and current accessibility/condition.

Remaining design: re-census the frozen district and approach-road endpoint;
keep underground and hydrology default-deny.

### MP10 — Ravensreach

Built/accepted: 63/63 durable features, eleven structures, 46 rooms, and the
exact Ravensreach–MainStreet physical route.

The first circulation repair is accepted: `CIVIC-RRCH-MOOT-UPPER-SPINE`
replaced the old two-wide core with a guarded 7-wide × 6-high Moot vertical
spine, two 1:2 flights, and seven-deep landings at `Y=73/80/87`. Independent
QA proves a 509-cell bidirectional normal-walk connection; it does not claim
the Committee, Meeting, Clerks, or Attic room programme is complete.

Not built or not proven: the citizen-fleet configuration patch, fresh town
condition, and new Town Expansion/underground interfaces.

Remaining design: re-verify the physical route, then review the configuration
as a separate nonphysical change. Never infer configuration deployment from a
route PASS.

### MP11 — Town Expansion R1

Built/accepted:

- 3,665,580 unique target cells and 483,016 exact forward/inverse groups.
- 22/22 terminal route checks and 1,178/1,178 media checks.
- 340/340 durable records.
- 13 exact reviewed interfaces and zero unreviewed interfaces.

Not built or not proven: requested program language broader than the imported
exact `physicalClaim` records, or any future unreviewed change.

Remaining design: preserve the immutable release chain; use new exact packages
for future work. The natural-copper exception remains rollback-only.

### MP12 — Westlight District

Built/cataloged: 59/59 durable records, including 14 buildings, 34 rooms, and
ten stair-based vertical-circulation records.

Not proven: current post-Town-Expansion condition, exact shared cells,
waterfront/transport operation, and current live route clearance.

Remaining design: reconcile the later terminal state and exact interfaces,
then design maintenance with enclosure, water, container, and route controls.

### MP13 — Westlight Venue

Built/accepted: 26/26 durable records plus the 524-cell reversible infinity
screen release and its 48 accepted views.

Not proven: current audience circulation, event modes, emergency lighting,
accessibility, operations, and exact interface condition.

Remaining design: read-only condition/operations survey before any mode or
life-safety engineering; keep venue, district, approach road, PassageWay, and
Town Expansion owners distinct.

## 5. Cross-Town Railway

### Proven existing pieces

- One continuous 552-cell passive B09 rail component over indices `9..560`.
- One authenticated bounded maintenance shuttle over indices `9..25`.
- Enumerated R11 highway/pedestrian surface components, not a whole corridor.
- Eight sealed Empty Eight future stubs.
- The cataloged Western Approach Road feeder.
- The accepted Ravensreach–MainStreet physical route.
- Town Expansion's accepted cross-area routes and 13 exact interfaces.

### Missing before passenger railway construction

1. One exact, source-proven, owned alignment between selected town nodes.
2. Civil profile, foundations, water/drainage/utility treatment, and protected
   feature clearance.
3. Public stations and max-step-one/accessibility approaches with exact
   public/private boundaries.
4. Continuous supported passive rails and headroom.
5. Transactional controls, power, signals, vehicles, rescue, and rollback.
6. End-to-end and return-direction commissioning from one immutable post.

### Proposed service concept

The proposed Cross-Town Railway would link Westlight, Ravensgate,
Ravensreach/MainStreet feeders, Gateway, and the Combined Zones in stages. No
exact alignment is selected here. The design freeze must derive one from a
fresh terrain/ownership survey; it must not draw a centerline through catalog
envelopes or open Empty Eight future stubs by implication.

Restricted Cheyenne, BOH/private-club areas, FIRE-EG-B, and sealed future
interfaces are not public stations.

## 6. Executable dependency order

| Order | Gate | Current status | Required exit |
|---:|---|---|---|
| 0 | X0 evidence freeze | **Ready, read-only** | Hash-bind all thirteen plans, current catalog census, accepted posts, and supersession rules. |
| 1 | X1 ownership/interface graph | **Ready, read-only** | One owner per cell; every seam exact; envelope-only overlaps rejected. |
| 2 | X2 route/terrain/hydrology/asset survey | **Needs fresh immutable snapshot** | Exact road/walk truth, rail terrain, fluids, gravity, entities, BEs, utilities, protected features, and station approaches. |
| 3 | X3 railway design freeze | **Blocked on X2** | Integer alignment, profiles, cross-sections, stations, reservations, packages, interfaces, and inverse strategy. |
| 4 | X4 static enabling works | **Blocked on X3** | Accepted dry foundations, culverts/bridges, retaining, isolation, and closed station shells. |
| 5 | X5 passive guideway/approaches | **Blocked on X4** | Continuous supported rail/headroom and safe public approaches to sealed holds. |
| 6 | X6 power/control/signaling/rescue | **Blocked on X5** | Transactional mechanisms/BEs, fail-safe behavior, and rescue path. |
| 7 | X7 bounded vehicle trials | **Blocked on X6** | Tagged forward/return probes with recovery and rollback. |
| 8 | X8 passenger commissioning | **Blocked on X7** | One terminal post proves both service directions, stations, accessibility, evacuation, and preservation. |
| 9 | X9 catalog/maps/publication | **Blocked on X8** | Import and publish only hash-bound accepted identities. |

X0 and X1 are the next legitimate actions. X2 is the first step requiring a
new saved-world capture. X3–X9 cannot be honestly started as construction from
the existing evidence.

## 7. Hard execution boundaries

For every physical package:

1. capture a fresh immutable same-invocation source;
2. use complete canonical block states and exact source guards;
3. prove one owner per cell and every shared interface;
4. exclude or exactly migrate entities, containers, block entities,
   mechanisms, fluids, gravity dependencies, utilities, and protected assets;
5. generate exact forward and inverse operations;
6. pass strict-noop parser checks and complete source preflight;
7. execute journaled and fail closed;
8. capture a fresh post, run exact/function/route QA, and prove rollback.

Unknown state blocks only its exact package and dependent seam. It does not
stop unrelated work. Conversely, a bounded package never authorizes a whole
route, public/passenger service, accessibility, hydraulic capacity, utilities,
or external opening.

Database import, map generation, media capture, and publication follow
physical acceptance. They cannot manufacture it.